Long Draw Solar
BNB developed the 225MWac Long Draw Solar project on 1,600 acres of range land three miles east of BNB’s Mesquite Creek Wind farm and directly adjacent to the Long Draw Substation, an ERCOT node. BNB sold the development to Engie in 2018; construction started in 2019, and the utility-scale power plant was commissioned in December 2020. The electricity generated by the plant is sold under long-term PPAs to the City of Denton, New Braunfels Utilities, Garland Power and Light, and Kerrville Public Utility Board.
Project Overview:
Location: Borden County, Texas
Size: 225MWac
Status: Operational (2020)
BNB RENEWABLE ENERGY HOLDINGS
NEW YORK CITY | AUSTIN
Copyright 2021